336 Participants
374 Participants
EPC Proposal ; ADCO Flow lines and WellHeads by Hafiz Ali Alvi February, 2013 - Present Lead Engineer
EPC Proposal : 120 MW Co-Generation Coal / Baggase Based Power Plant by Hafiz Ali Alvi November, 2012 - Present Lead Engineer
Tatweer Tank Batteries and well Manifold by Hafiz Ali Alvi, Ali Sharaq, Mahfooz Ali February, 2012 - Present The Awali Field in Bahrain located approximately 40km south of the capital city Manama is a mature oil and gas field owned and operated by Tatweer Petroleum. In order to increase production from the Awali Field the owners are undertaking a field development project where a new drilling programe will install approximately 600 new wells up to 2018. To process the increased production new light oil facilities are required in the Bahrain field and it is planned to install two (2) New Tank Batteries and fifteen (15) New Well Manifolds. Each Tank Battery will have a set of common facilities serving two separation trains with provision for a third separation train to be added in future. Each Tank Battery separation train will be designed to handle an oil flow rate of 10,800 bbl/day, a produced water flow rate of 69,500 bbl/day and 1% of the total liquid volume for residual gas. Each Well Manifold will be designed to handle an oil flow rate of 3,000 bbl/day, a produced water flow rate of 20,000 bbl/day; and an associated gas flow rate of 20 MMSCFD. New pipelines are to be installed to provide connectivity with both new and existing field infrastructure.
Compressor Station (CS9) by Hafiz Ali Alvi, Rahul Singh, Eswar Kumar, Ram Chandra Prasad June, 2011 - Present JGC Gulf International won the contract with the most competitive bid price of US$42.4m. The contract under LSTK format include the design of the gas compressor, a gas turbine driver, pipelines and associated gas gathering lines, power supply and the station's process equipment and utilities. The gas compressor is designed to have a capacity of 60 million cubic feet per day (cf/d) and will help ensure continuous handling of up to 310 million cf/d of associated and refinery off gas.
Petro Rabigh Warranty Works Project by Hafiz Ali Alvi, Majid Al Mubarik, Ahmad Alqasomi, Mahfooz Ali, Nazim Malick November, 2010 - Present Field Engineer
Isolation Of Trunklines Project, ADCO by Hafiz Ali Alvi December, 2009 - Present Lead Engineer
Engro CO2 Recovery Project by Hafiz Ali Alvi, Kamran Malik, Muhammad Sohaib, Abdul Hameed, Salman Maqbool December, 2008 - Present Lead Piping Material Engineer
Urea Debottlenecking Project by Hafiz Ali Alvi, Khayyam Shabir, Atif Tariq, Muhammad Sohaib July, 2007 - Present Lead Piping Material Engineer
348 Participants | Career
603 Participants | Manufacturing & Processing
217 Participants | Materials
272 Participants | Materials
84 Participants | Materials
101 Participants | Nondestructive Examination
336 Participants | Petroleum (Fossil Power)
722 Participants | Pressure Vessel Engineering
110 Participants | Plastics Design
374 Participants | Solar
148 Participants | Volunteers
1008 Participants | Volunteers