Mohamed Abd El-Halim Avatar

Mohamed Abd El-Halim

Sr. Construction Engineer

My Experience focused primarily on Piping and Pipelines Construction Activities Worked in Egypt and Iraq in Projects construction: Power Plants, GAS & Petroleum Process Plants, and On Shore Pipelines. Duties have included Executing, Supervising, Technical Support, Planning, managing and Coordination for in-site mechanical Activities.

experience

Senior Construction Engineer – Mechanical  
ELSEWEDY Power System Projects – PSP, June 2017 to Present Egypt
(Construction)
1- Assuit Supercritical Power Station 1X650 MW, Assuit, Egypt June 2018 till now Main Contractor for CP-118 (Mechanical Equipment / Pipe Installation) Job role: Senior Construction Engineer – Mechanical for Non critical Piping, supervise the subcontractor work and review its plans and provide the required technical support 2- Beni Suef Combined Cycle Power 4800MW, Beni Suef, Egypt June 2017 till Jun 2018 EPC for Beni Suef new Combined Cycle Power, Consortium between ElSewedy Electric & SIEMENS Job role: Senior Construction Engineer – Mechanical for HRSG 42 (one of MOD 40 boilers) MOD 40 boilers is the 1st Self-Execution boilers done by PSP, MOD 40 team Nominated as the Best Area (for safety Performance), and Nominated as the Best Contractor (for overall Performance) The biggest achievement one was to finish all the construction of two boilers within only 6 months

Mechanical Engineer  
The Petroleum Projects and Technical Consultations Company – PETROJET, August 2014 to June 2017 Iraq
(Oil & Gas Construction)
1- SIBA Field Development Project, Basra, Iraq Feb 2016 till June 2017 EPC project for Central Processing Facility, for Kuwait Energy Iraq limited (KEIL) 1st EPC process plant by PETROJET Job role: Senior Mechanical Engineer, issued all documentations for piping construction activities (Work Packs, Method of statement and Procedures), and held all kick of meeting and presentations for those activities, succeed to solve many technical obstacles in the construction of flow lines for the facility, also succeed in fast track excitation of the firefighting GRE underground network 2- 200 KM Khor Al Zubair – Nassiriyah 16” LPG Pipeline (PL.), Basra, Iraq Sep 2014 till Feb 2016 Job role: Site Manager for 70 KM section, succeed to finish all construction activities for the 70 KM which mainly consist of 3 river crossing, 25 road crossing (thrust boring & Open Cut) and 4 valve room stations

Mechanical Engineer  
The Petroleum Projects and Technical Consultations Company – PETROJET, February 2011 to September 2014 Egypt
(Oil & Gas Construction)
1- 20 KM Length, 10” Ammonia PL., Suez, Egypt Feb 2014 till Sep 2014 Job role: Mechanical Site Manager, succeed to overcome the lateness of project start and finish all work in fast track schedule plus change order equal to 30% of project budget 2- 6 KM, Sokhna Power station 20” Feeding Mazut PL., Suez, Egypt Dec 2013 till Feb 2014 Job role: Superintended Mechanical Engineer, succeed to select the best route of the pipeline in the project initiation phase as the area was having many obstacles and future construction facility 3- Mechanical site Engineer Feb2012 till Dec 2013 - 4.5 KM, Sokhna Power station 24” Natural Gas (NG.) PL., Suez, Egypt - 40 KM Gamasa - Venusa 42” NG. PL., Dakahlia, Egypt - Utility Cycle, New land Oil Train, South Sinai, Egypt - 6 KM, 32” Importing NG. PL. Suez, Egypt - 90 KM, Badr - El Tebbin 20" Petroleum PL., Helwan, Egypt - 9 KM, 32” Water Disposal PL., South Sinai, Egypt - 1 KM Length, 20” Ezz Steel Feeding NG. PL., Suez, Egypt - 34 KM, Abo Sultan – ElShabab Power Station 24” NG. PL., Ismailia, Egypt - 14 KM, Gamasa – Abo Madi 24” NG. PL., Dakahlia, Egypt

education

Ain Shams University  
Bachelor of Engineering, Mechanical Engineering, Design & Production Department, Sep, 2005 to Jul, 2010