Vasilios Artemiou Avatar

Vasilios Artemiou

Mechanical Engineer

I am a mechanical engineer who focuses on HVAC building systems for new construction projects such as high rise residentials, hotels and commercial projects. All my projects have fallen under the jurisdiction of the NYC DOB, which oversees some of the strictest construction codes in the nation. The...
See More

experience

Mechanical Engineer  
Cosentini Associates, February 2015 to Present, New York, New York United States
(HVAC)
HVAC for new construction projects such as high rise mixed use buildings. Design of systems included factory built residential heat pumps, floor air handling units horizontal DX AC units. More complex systems have included built up custom air handling units of up to 120,000 CFM.

Mechanical Engineer  
Lizardos Engineering Associates, July 2013 to January 2015, Mineola, New York United States
(HVAC)


education

Columbia Univ  
Bachelor Of Science, Mechanical Engineering, Aug, 2011 to May, 2013


Adelphi University  
Bachelor Of Science, Physics, Aug, 2008 to May, 2011


projects

532 Neptune Ave  by      
November, 2015 - Present
Mixed use residential with water source heat pumps for the apartment units and chilled water fan coils for the lower retail and commercial portion. Building contains combined heat and power plant which supplies power to base building load and provides hot water for absorption chiller operation and building heating.

730 Fifth Ave-Crown Building  by      
January, 2016 - Present
Commercial building at the corner of 5th ave and 57th street in Manhattan. Full conversion from an office building to retail, hotel and high end residential. Building system is a 4-pipe fan coil system with (3) 500 ton chillers on the 4th floor and the cooling tower on the roof of 15th. Con Ed steam is used to produce heating hot water through shell and tube heat exchangers.

2 Broadway  by      
February, 2017 - Present
Flood mitigation project which relocated the Con Ed steam rig of the building to a location above the flood plain. Con Ed steam rig and building PRV station were rebuilt in new location above the flood plain. Con Ed steam meters were upgraded.

White Plains Hospital  by      
March, 2014 - December, 2014

Memorial Sloan Kettering Hospital  by      
January, 2014 - May, 2014
Performed study to assess the feasibility of replacing current steam heating system of building to hydronic hot water system. Entire steam system was surveyed and hot water system was designed to capacity of existing system.

626 Sheepshead Bay Rd  by      
January, 2016 - Present
Multi story retail and office building. Building system is a condenser water system with a 3 cell cooling tower. Core office spaces are served by 33 ton water cooled DX units with economizer coils and hot water coils.

Lower Manhattan Hospital  by      
January, 2014 - April, 2014

Certifications

  • Leed Green Associates
    USGBC (10987362)
    April 2015